Wetside Changing Rooms Refurbishment Project
The Wetside Changing Rooms and Health Suite at Brixton are currently closed for refurbishment. The project will allow a number of improvements to the area; Increased family changing and direct access onto poolside, new flooring, new lockers and cubicles, pre-entry showers, dedicated vanity area and an increased Health Suite area.
Whilst the works take place the Level 6 Male and Female Changing Rooms are adapted for swimmers and include a new route onto poolside. Other centre Changing Rooms on Level 4 are available for all other centre users. A reduced swimming timetable is in operation during the works period.